Cooperate with sales and handle theLacoste Polo Shirts CCTV’Lacoste Polo Shirtss project. The detail work include understand the customer’s need, design the system, write the proposals for the projects, draw the System Topology and wirte the price list. Follow the customer needs to write PPT.
For some CCTV’s products, I have Cheap Lacoste Polo ShirtstoCheap Lacoste Polo Shirts join in the project group and responceable all the technical work in the project, even some implement work, such as installing and debugging the database, adjust the switch.
Involved the CCTV’s projects :1. Involved the Storage System Project of the CCTV new site:
a) Join in the design of the centery chi hair straightenerstorage system,chi hair straightener include build up the structure of the system, design the work flow, define the interface with other system.b) Communicate with some storage companies, compare their products and know their feature. All this is for the storage tests in next step.c) Write the storage test program and prepare the test equipment and the test environment.
d) Involved the test for the data safe, especially test the Continual Data Protect(CDP) technologh in different company.
e) Join the critical point report meeting of the storage system.2. Involved the News System Project of the CCTV New Site:
a) Responsible for deeply design the NDS, include: discuss the interface between the NDS, News Exchange Platform and NPM; investigation the customer’s need and estimation the load of the development.b) Responsible for analyse the function and the process for the Incepting System, the News Producting System and the News Including http://www.7abetk.com/forum
http://forums.pottershots.net
http://koorasudan.com/vb
http://www.apnaspace.com/forum
http://connectedcommunities.us
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment